|
Our Current Specials

Tax Credits IRS
2011 Tax Credit
Extension
As
part of the recently passed tax bill, the 25C tax
extension for residential high efficiency property
has been extended for one year. The maximum tax
credit that can be claimed has been reduced from
$1500 to $500 for 2011. In addition, the 2011 tax
credits have placed maximum amounts that can be
claimed for the various components of the HVAC
system, such as a $150 maximum tax credit for a 95%
gas
furnace and $300 for an air conditioner
or heat pump. These component maximum amounts are
additive to the $500 maximum lifetime tax credit.
Most of the HVAC
qualifying efficiency levels have remained the
same. The only exceptions are boilers and oil
furnaces, where the qualifying efficiency
has been increased from 90 AFUE to 95 AFUE. The
following chart summarizes the difference between
the 2009-10 tax credits and the newly passed 2011
tax credits. Changes in the tax credits for 2011
are highlighted in red
|
Product |
2009-2010
Tax Credit |
2011 Tax
Credit |
|
General
Provision |
30% of
installed cost up to $1500 |
10% of
installed cost, up to $500 |
|
Central AC |
Split
System:16 SEER & 13 EER
Packaged Unit: 14 SEER & 12 EER
30% of installed cost, $1500 max |
Split
System:16 SEER & 13 EER
Packaged Unit: 14 SEER & 12 EER
10% of installed cost, $300 max |
|
Furnaces |
Gas Furnace:
95 AFUE
Oil Furnace: 90 AFUE
Boilers: 90 AFUE
30% of installed cost, $1500 max |
Gas
Furnace: 95 AFUE
Oil Furnace: 95
AFUE
Boilers: 95 AFUE
10% of installed cost, $150 max |
|
Efficient
Indoor Fan |
30% of cost
of fan, $1500 max |
$50 |
|
Heat Pump |
Split System:
15 SEER, 12.5 EER. 8.5 HSPF
Packaged Unit: 14 SEER, 12 EER, 8 HSPF
30% of installed cost, $1500 max |
Split
System: 15 SEER, 12.5 EER. 8.5 HSPF
Packaged Unit: 14 SEER, 12 EER, 8 HSPF
10% of installed
cost, $300 max |
|
* Consumers should consult a
tax professional to ensure they
qualify for the tax credit. Effective 2011
calendar year. |
|
|
|
Our
Residential Services |
| |
|
Service: |
|
•
|
Factory Trained
Technicians
|
|
•
|
24 hour Emergency
Service
|
|
•
|
Radio Dispatched Service
Technicians
|
|
•
|
Planned Maintenance
Agreements
|
|
•
|
Service All Makes and
Models
|
|
•
|
Design, Installation,
and Service
|
| |
|
|
Service, Sell and Install |
|
•
|
Air Conditioning Systems
|
|
•
|
Heat Pump Systems
|
|
•
|
Furnace Systems
|
|
•
|
Indoor Air Quality
Systems
|
|
•
|
Temperature Controls
|
| |
|
|
|
 |
 |